There are 3 towers of hotel blocks and North Podium which includes the convention halls. The three towers have a main transfer tank supplying to the three tower top level storage tanks with mid floor intermediate tanks.
All 7 numbers of water tanks with dividers are controlled by 14 sets of float valves. From the top storage tanks, the cold water dropper pipes distributes domestic water to the different levels. Controlling the downstream water pressure are 108 numbers of pressure reducing valves.
North Podium has two storage water tanks with dividers and direct feed from PUB main supply domestic water have 4 sets of float valves to control the high and low level of the tanks. From this 2 tanks, 24 numbers of pressure reducing valves maintain the downstream pressure to the supplies of the whole Podium.
Products: Cla-Val Roll Seal 316L stainless steel pilot operated non-modulating float valve / pressure reducing valve
There are NEWater water pipeline locate underground of the pathway in Jurong Lake near to the Jurong pumping station. The main purpose of the pipeline is to divert the water out to the reservoir. On the pipeline there are isolation valve which is controlled by the operator inside the pumping station via 4-20mA signal. We have a pressure reducing valve installed in the pipeline to regulate the flow and control the pressure before the water divert out to the reservoir.
Products: Butterfly valve with torque limiter, Motorised butterfly valve, Plunger valve, Tilting Disc check valve, Gate valve, Air valve, Dismantling joint
Changi Water Reclamation Plant (CWRP), located at the eastern end of Singapore, is one of the largest and most advanced reclamation facilities in the world.
Construction started in May 2001 and was completed and opened June 2009.
The plant has a capacity to treat 176 million gallons (800,000 cubic meters) of used water a day. The plant will undergo phased expansion until its capacity reaches 528 million gallons of water a day.
CWRP is part of the 48km deep tunnel sewerage system (DTSS) from Kranji to Changi.
DTSS is an important component of Singapore’s water management strategy. It allows every drop of used water to be collected, treated and further purified into NEWater, Singapore’s own reclaimed water.
Products: Metal Seated Ball Valves (Hydraulic Operated), Eccentric Plug Valves, Butterfly Valves, V-Port Ball Valves, Pinch Valves, Penstocks