  • KLCC District Cooling – KL
  • Mengkuang Dam – Pulau Pinang
  • Bertam Water Treatment Plant
  • Pantai 2 Sewage Treatment Plant
  • Langat 2 Water Treatment Plant and Water Reticulation
  • 3000mm BFV unloading at Semantan Pipeline Site
  • Sepang & Petaling Jaya Pressure Reducing Valve
  • Government Building Putrajaya Booster Pump Control Valve
  • Petronas Twin Tower Booster Pump Control Valve
  • 20th Century Fox, Genting Highlands Float Valve
  • Kinrara Selangor Pressure Reducing Valve
  • Langat 2A Water Treatment Plant, Selangor
  • Labohan Dagang Water Treatment Plant, Selangor
  • Buluh Kasap, Johor Altitude Valve Installation

Take a look at our products page or contact us directly for project collaborations.

Bertam Water Treatment Plant

Client: Cipta Wawasan Maju Engineering Sdn. Bhd.

Bertam WTP is part of 4 packages involve new raw water pumping station, pipeline, reservoirs and extension of existing Bertam WTP. In order to cater for new electrical demand, new 11kV Vacuum Circuit Breaker (VCB) installed at Raw Water Pumping Station and Bertam WTP. 

Products: Check Valve, Butterfly Valve

Langat 2 Water Treatment Plant

Client: Salcon Engineering Bhd

The Langat 2 Project is for the water treatment and distribution facilities for water transferred from the Pahang-Selangor Raw Water Transfer (PSRWT) Project for an ultimate nominal treated water output capacity of 2260 Mld.

Products: Gate Valve, Check Valve, Butterfly Valve, Air Valve

Pantai 2 Sewage Treatment Plant

Client: BEWG (M) Sdn. Bhd.

The Pantai 2 Sewage Treatment Plant (P2STP) was built to replace the original facility. This new state-of-the-art mechanised underground regional sewage treatment plant has proved to be a model for innovation in concept, design, engineering and construction—setting new standards for sewage treatment in Malaysia and transforming its surrounding environment.

Products: Gate Valve, Check Valve, Butterfly Valve, Knife Valve